MY Sheran



When the boat was bought by the present owner in 2015, he has chosen Port Yacht among other competitors for the initial refit. The boat has been serviced by us since then.
In 2015 – 2016 season, pipes and some components in the black water, sea water & A/C system were replaced. [1] [2]

Engine raw water heat exchangers were maintained. [3] [4]

Hydraulic system, hoses and cooling components were serviced. [5]

Water-maker was overhauled. [6]

All sea water valves and pumps were serviced. [7]

Dark blue band on the superstructure and whole transom was painted with AWL-GRIP coating system. [8-9-10-11]

New exhaust mixers were manufactured and installed. [12]

In 2016 – 2017 season, Ecomar 32 sewage treatment plant for double tank system was installed. This unit treats both black water and grey water systems and the output water is certified according to the international standards and are also accepted by the Turkish maritime authorities. [13]

The product can be inspected at >https://www.tecnicomar.it/prodotto/ecomar/?lang=en

All exhaust line was renewed with stainless steel. [14]

Also precise fuel tank sensors were installed to the boat. [15-16-17]

In 2017 – 2018 season all skin valves were renewed. [18]

Stainless steel engine raw water filters were replaced. [19-20]

Exterior exhaust boxes were painted with Awl-grip coating system. [21]

Bow thruster system was serviced. [22]